skip to Main Content
Speak with a Training Specialist 1-800-826-1901 Interested in Seminar Training? Click Here Request Info Tech Support
SimTech Pro

The 2020 SIMTECH™ INJECTION MOLDING CHALLENGES HAVE CLOSED!

We’ll be announcing the winner for December and naming the 2020 Top SimTech Injection Molding Champion soon. Watch for details!

Welcome to Paulson Training Programs’ SimTech™ Injection Molding Challenge, part of a series of monthly challenges testing your injection molding abilities using the world’s most advanced injection molding simulator – SimTech™.

The Challenge? Make a defect-free part, within specifications per the instructions of each month’s particular challenge scenario. It’s FREE! Plus, win a prize for 1st, 2nd, and 3rd-place each month including a chance to win a $500 training credit toward a Paulson online course or seminar, and earn a spot on Paulson’s Challenge leaderboard! To really sweeten the pot, THERE’S MORE! At the end of the year, all the first place monthly winners will be eligible for the Grand Prize of $6,000 worth of training from Paulson. Think you can win for yourself and your company and be crowned the Plastic’s Industry TOP MOLDING CHAMPION?

______________________________________________________________________________

THE DECEMBER 2020 Challenge is CLOSED. THE DECEMBER AND OVERALL WINNERS WILL BE ANNOUNCED SOON.

Open: CLOSED
Closes: ENDED
Difficulty: HIGH Difficulty
Scoring:
“Parts Per 120 Hour Job” Scoring 


December Molding Challenge Details  

Scenario

In this month’s challenge you will be molding a Box with a living hinge out of HD Polyethylene using a 300 ton molding machine equipped with a screw designed for semi-crystalline material. We will again be using the “Parts per 120-hour job” scoring method.

Your job is to correct any machine alarms, correct any part problems, and adjust the machine settings to get the best molding efficiency percentage. The quoted (standard) cycle time for this job is 9 seconds.

You will see under the Cycle Results, the “Mold Full at VPT” is 9999. This VPT setting is not optimized. You do have to optimize the VPT setting.  The VPT should occur when the mold is between 94% – 96% full. The part has some problems. The part is undersized, has sink marks, burn marks, flash and is short. Additionally, there is a machine alarm that must corrected. Notice the part is not within the part specification of 10.000” ± 0.002”. The part has a precision dimensional specification of +/- 0.002 in.

Our molding experts have achieved a score of 99,997 parts/job. Can you eliminate all problems and mold better than a 9 second cycle? Can you beat the 99,997 parts/job score?

Review of “Parts per 120-hour Job” Scoring Method

The score displayed on your screen is based on the number of parts made so far (without defects), plus the projected number of parts to be made in the remaining time based on your current settings.  Such things as running a cycle, take time and are factored into you score. 

For example

  • Each click of the Cycle button consumes some time equivalent to the current cycle time
  • Changing barrel or mold temperatures consumes time proportional to the amount of change
  • Time penalties are implemented for taking hints

Additional Conditions

  • The minimum Melt Temperature of 386°F is allowed for HD Polyethylene.
  • The minimum Mold Temperature allowed is 70°F.
  • The standard (quoted) cycle time for this job is 9 seconds.

In order to receive a score, all of the following conditions must be met:

  1. No part problems or alarms
  2. Part must be molded with a precision tolerance on the length. (+/- 0.002 in.)

“Best Practices” must be met:

  1. Mold Full at VPT must be 94% – 96%
  2. Cushion Size must be less than 10% of the Screw Back Distance
  3. Melt Temperature must be within ± 2°F of the Nozzle and Front Zone Temperature

Good to Know: Clicking on the “History” button will give you valuable information on how you are doing.

Get Started

  1. Log into your SimTech account at www.paulsonsimtech.com
  2. Click Login or Register (if 1st time in SimTech)
  3. Click on “Run Challenges”
  4. Choose “December Challenge 2020” and click on “Run”
  5. Click the “Cycle” button to begin to see the results of the present setup. Start to make controls changes, one at a time, and then click “Cycle”.

NOTE: Only make one control change at a time and then click the “Cycle” button to see the effects of that particular control change. This is the best practice to follow when making any control changes whether it be in SimTech or on an actual molding machine.

What's SimTech & How Do I Use It?

Throughout the challenges, participants will be added to the Challenge Leaderboard posted here.

View the Challenge Leaderboard by clicking on the #1 badge6

What molders have to say about Paulson Training products:

Very informative. You will understand how material affects molding!

Cynthia Miller

“Great, excellent, easy-to-use, interesting, challenging, engaging, organized, informative, helpful, solutions oriented, accurate, effective, flexible, confidence building and worthwhile.”

John W. Stebelton

“Paulson has built confidence, a sense of accomplishment & pride in our workers, something they can take to the floor and apply!”

Gene Shuret

Watch for details on who will be named the 2020 TOP SimTech Injection Molding Champion!

Have fun testing your molding skills using Paulson’s most advanced injection molding simulator SimTech™ no other plastics simulator has the ability to process over 26 million molding simulated calculations.

Good Luck! May the best molder win!

Get on the list now to have the latest challenge releases sent to your inbox. 

SimTech™ Challenge FAQs 

Click each icon below for answers

How does the Challenge work?

Each month, Paulson’s molding experts will devise a new molding problem for you to solve. For example, you will be challenged to mold a specific part without any defects and with the fastest cycle time. Once you’re in SimTech™, you will see the virtual control panel where you will be able to view the part, the plastic, and the machine specs in order to “mold” your part effectively. Bonus points are given, BUT if you need to access “hints,” points will be lost. Besides winning, the actual goal here is to learn.

Will I win anything?

Yes! Each month you’ll have a chance at winning a 1st, 2nd, or 3rd-place prize including eligibility to win $500 worth of training credits to put toward an online Paulson course or seminar. But wait! There’s More! At the end of the year, only ONE PERSON and their company will be chosen among all the previous monthly FIRST PLACE winners for the GRAND PRIZE of $6,000 worth of training from Paulson. Plus, each participant can earn a spot on Paulson’s Challenge leaderboard. Paulson’s SimTech Challenges are ideal for in-plant competitions too. Gather your team together for a friendly internal competition all while gaining critical thinking and key troubleshooting skills. Get Ready! Who will be this year’s SimTech Injection Molding Champion?

What is SimTech?

SimTech™ is Paulson’s most advanced, proprietary, injection molding simulation tool. It’s a powerful online engine built on decades of complex mathematical equations of plastic and process analyses that combine both molding theories and practices. All together, SimTech™ has the outstanding capability to process some 20 million calculations per simulated cycle, and check all possible simulations against possible errors. No other injection molding simulation tool is more powerful!

How do I enter?

In order to participate in the monthly challenges, you MUST register by filling out the form. You will then receive email alerts when each challenge is released. Act now and be ready to take the challenge.

May the Best Molder Win!

Have more questions? Call us! 800-826-1901.

×Close search
Search
I want to try it FREE